• Facebook
  • Google +
  • Linked In
  • Blog
 
732-514-6604

19) Assigning resources to advance work center

In advance work center all the scheduled trips will populate. If user wants to reassign resources like vehicle and driver to any particular schedule, user have to select resources from the left pane of the advance work center and drop against the trip in the right side panel against the trip and save. Advance work center provides drag and drop functionality from left pane to right pane to make resource assignment easy.

 

FAQ 19

Trip Start and End time

Idle Time Engine On and Off during the trip

Miles Traveled

Month